Blog

20 October 2015

Water level control in a hydro power plant

Easy-Laser were called out to a measurement and alignment job in northern Sweden a couple of months ago. I would like to share my experience using our dual detector, point laser, E710 alignment system. Read more
06 October 2015

Why use multipoint program

Three measurement points or multiple? Maybe you have repeated the final measurements over and over again, just to be sure on the results. This is an example where the Multipoint function would be a better way. Read more
14 September 2015

Alignment relates to machine availability

In our optimised world, machines work for precisely the time for which they are designed, in the best case scenario. The finances then work as they should, we adapt production to requirements and debit and credit work together. Read more
03 March 2015

Making the impossible possible

In November 2014 we got an urgent call from one of our long time contacts at a contracting company based in Brazil. They were on site, working on getting one out of four gas turbines back online after an unscheduled shut down. Time was of the essence, they needed someone on site within one week! This is the story of how a complicated alignment job was solved by a clever Easy-LaserĀ® alignment technician. Read more

Subscribe to our newsletter

Stay up to date with the latest news from Easy-Laser. 

I accept the terms in the Privacy policy